Planning Cross-Role Classroom Exercises for Saudi Project TeamsA contractor’s project team in Dammam spends a full day in a project management course: scope, schedule, cost, risk, and stakeholders, one slide deck after another. Three weeks later, a key equipment delivery slips. The planner rebuilds the schedule, the site engineer resequences the work, procurement chases the supplier, and the cost controller prices the overtime, each separately. The client receives three different recovery dates in one week.
Nobody in that team lacked knowledge of project management. What they had never practiced was making one decision together, with each role bringing what only it knows. That is a skill a lecture cannot build.
This article shows training and project leads in Saudi Arabia how to plan a cross-role exercise in instructor-led training (ILT) for one project team: role cards, one joint decision, and an assessment of what the team produces. All scenarios are hypothetical.
Why a Lecture Rarely Changes How a Project Team DecidesLectures transfer concepts. Joint decisions depend on something else: knowing what the other roles need, raising your own constraint at the right moment, and turning several views into one output. Evidence from education points the same way. A meta-analysis of 225 studies in university science, engineering and mathematics by Freeman and colleagues found that students in traditional lecture classes were 1.5 times more likely to fail than students in active learning classes, and the authors support active learning as the preferred teaching practice.
A workplace project team is not a university class, but the lesson carries over. If the goal is better decisions at the joins between roles, the ILT day should be spent making such a decision, with the content a lecture would cover built into the cards and the debrief.
Pick One Joint Decision for the ILT ExerciseStart from a decision, not from a topic. A good candidate for a cross-role ILT exercise has three features: it needs input from at least three roles, it recurs on your projects, and it ends in a concrete output that can be checked. Examples from Saudi project environments include:
Ask the project manager and one experienced team member to supply the case from a real past decision, with names and figures changed. A case the team half-recognizes makes the ILT discussion realistic without reopening old arguments.
Keep the ILT exercise inside one team. If the real conflict is between two teams competing for the same people or equipment, it calls for a different format, described in an instructor-led workshop on competing priorities between teams.
Write ILT Role Cards, Not ScriptsEach participant receives one printed role card. A role card is not a script of lines to say or a personality to act. It holds four things:
Give people their real roles in the first round, so the ILT exercise rehearses actual working relationships. In a second ILT round, swap two or three cards: a planner who has held the cost controller’s card for half an hour understands far better why the cost question keeps coming up. Print the cards in different colors so the facilitator can see at a glance which role is speaking.
Running the Exercise in the ILT RoomA half-day ILT session fits one full round, one shorter round with swapped cards, and the debrief. A workable timeline for each round:
Prepare the ILT room before the team arrives: one table, cards face down at each seat, the case summary and a blank output template in the center, and a clock everyone can see.
The ILT facilitator does not steer the decision. An observer, ideally a senior project manager or subject matter expert from outside the team, notes which role raised each constraint and when. If the decision depends on a system, such as a scheduling or document control tool, run the round in a prepared lab; see our guide to setting up an instructor-led software lab in Riyadh.
Assess the ILT Output, Not Only the DiscussionThe output is what makes this ILT exercise assessable. Use a one-page template with fixed headings: the decision; the options considered; the effect on scope, time, cost, quality, and safety; the main risks with an owner each; and what will be communicated to the client and to whom.
Before the ILT session, ask the subject matter expert to complete the same template as a model output. Then score the team’s output with a short rubric:
Add the observer’s note on which constraints surfaced and which stayed hidden on a card. A strong output with a hidden constraint usually means one role stayed silent, which is exactly the habit the ILT exercise is meant to change.
Debrief While the Team Is Still in the ILT RoomDo not end the ILT session when the output is handed in. Debriefs systematize reflection, discussion, and goal setting, and in a meta-analysis of 46 samples, Tannenbaum and Cerasoli found that they improved effectiveness over control groups, with similar effects for teams and individuals and in simulated and real settings. The authors also stress alignment between the participants, the focus of the debrief, and what is measured.
In this ILT exercise, that means a debrief with the whole team and three questions: How does our output differ from the model output, and why? What did each role know that the others needed earlier? What one change will we make to how we take this kind of decision on the real project? Record that change and give it an owner.
Practical Points for Saudi Project TeamsProject teams in Saudi Arabia often combine Saudi and expatriate staff, client and contractor representatives, and documents in Arabic and English. Write the ILT cards in the language the team uses for project documents, and let discussion run in whichever language the team works in.
Hierarchy can flatten an ILT exercise. If the project manager speaks first, others may simply agree. Ask the project manager to speak last in the first round, or to act as the observer while a deputy holds the card. Schedule the ILT session between major milestones, not in the week of a deadline, and hold it in a site-office meeting room, a room at your premises, or a venue you choose.
A Hypothetical Example: A Recovery Plan for an MEP ContractorThis example is hypothetical and shows only how the elements fit together.
A mechanical, electrical and plumbing contractor working on a hospital project in Dammam replaces its annual project management lecture with a half-day ILT exercise. The case: a chiller delivery will arrive three weeks late. Five role cards go to the project manager, planner, site engineer, procurement officer, and cost controller. The planner’s card holds the float on the critical path; procurement’s card holds an option for partial early delivery; the cost controller’s card holds the approved overtime budget; the site engineer’s card requires that any resequencing respects the site’s permit rules.
At the midpoint, the ILT facilitator announces that the client wants one floor handed over early. The team’s output covers schedule and cost well, but the observer notes that the permit constraint surfaced only in the last five minutes. In the debrief, the team agrees that any real recovery plan will be reviewed by the site engineer before it goes to the client, and the project manager owns that change. The training lead keeps the cards and the model output for the next ILT cohort, updating the case with a real delay from another project.
SummaryProject teams make their most costly mistakes at the joins between roles, and a lecture does not rehearse those joins. A cross-role ILT exercise does: role cards with responsibilities, private facts and protected constraints, one real joint decision with a change inject, an output scored against a model, and a debrief that ends in one change to real practice.
Where team members cannot meet, and the task can run over several days, collaborative eLearning tasks for project teams may suit better. Where the team can sit at one table, this kind of interactive training in ILT gives it practice in the decisions it will face next month.
Click here. If you would like to replace a project lecture with an ILT exercise built on your own team’s decisions, you can discuss your instructor-led training requirements with the SkillUp MENA team.